Highlights Building Kalamar 2, a Wharram Tiki 21
July 2001 - September 2001

 

Rope Pintels a la Wharram
Kaya Seizing Rope Pintels

Gaff.Here you can see the "liquid carpentry" very well.
Wooden Cleat

Haluk Topcoating Beams
Kurt carefully epoxying Holes.

Can Preparing Rubber Pads to take the beams.
Savas Attaching Lashing Blocks.

Cem masking the Deck.
Will the outboard engine fit?

Finally ready to move to the Waterfront.
Can Rigging up.

Sails set on Hard for the first time.
19 September 2001 4 PM. Launching!

Kurt Hoisting the Flag.
Kurt sailing her to Yalikavak.
 
PROFESSIONAL YACHT AND BOAT CARE, SERVICE IN TURGUTREİS - BODRUM -TURKEY
Last update: 12.06.2012 6:14 PM
yachtWORKS-Bodrum, All Rights Reserved, © Copyright 2002-2009

 


Site Meter